Navigating the draft framework
The draft framework sets clear milestones for existing networks. We assist operators in gathering the physical evidence and records required to progress through these stages.
Milestone Readiness Review
Structure work around the draft pathway from initial records and Energy Centre review through improvement planning, consumer connections, and Milestone 4 readiness evidence.
Performance Improvement Plans
Define monitoring points, read frequencies, and a structured Performance Improvement Plan (PIP) linked to measured issues and accountable remediation actions.
Evidence & Remediation Workflows
Organise maintenance, meter, condition, KPI, and corrective-action records, including the draft minimum three-month KPI evidence window where applicable.
Draft wording under review: official source changes may affect this wording until reviewed.
Structured Evidence Pack for Review
Meter configuration logs: Records supporting competent review of sizing, installation and manufacturer requirements.
Time-series performance data: Auditable, half-hourly records of temperatures and flows to support KPI assessment.
Condition surveys: Photographic and measured evidence of insulation quality and plant condition.
Action tracking: A clear log of identified faults, assigned owners, and dates of remediation.
Moving beyond spreadsheets
HNTAS readiness requires a robust chain of evidence. Managing meter data, maintenance logs, and improvement plans across multiple networks via disconnected spreadsheets introduces risk.
We combine our plant-room engineering surveys with the GESTI PULSE platform to maintain a governed evidence record for review.
Prepare your network evidence
Engage our engineering team to review your current monitoring capability against the draft HNTAS framework requirements.